When the tank location is already known and accessible, a pump and inspection typically takes 1–3 hours on-site. When the tank needs to be located first, add 1–2 hours depending on ground conditions and how much investigative work is required. Janice's job on Randolph Avenue, including location, excavation, full pump-out of a 1,000-gallon tank, inspection, backfill, and documentation, was completed from start to finish in a single morning.