This is where I see the most confusion. The tank is the first stage of wastewater treatment, and its capacity decides how much wastewater it can hold while solids settle. The drain field answers a separate question, which is how much liquid your soil can take in day after day.
Picture two four-bedroom houses, one on sandy soil and one on dense Upstate clay. Both need the same 1,000-gallon minimum tank. Their drain fields can be very different sizes, though, because different soil takes in water at different speeds. R.61-56 sizes the trenches using the home's design flow together with a long-term acceptance rate (LTAR), which reflects how many gallons of effluent per day each square foot of trench bottom can keep absorbing. Slow soil gets a lower rate, so the same flow needs more trench.
That rate comes out of the site evaluation. Because the Upstate sits above the Fall Line, SCDES
requires backhoe pits for the evaluation, which is why we often show up with an excavator to dig them. A lot of homeowners call this a perc test, and it's the step that really decides your drain field size. If you want a head start, the
USDA Web Soil Survey shows mapped soil types for your parcel, although only the on-site evaluation counts for the permit.
So when someone asks me what size septic tank they need, I usually ask back whether the land has been evaluated yet. Bedrooms decide the tank. Bedrooms and soil together decide the drain field, and the drain field usually drives the price. One local note, too. In South Carolina the local health department isn't the office that handles septic permits. That job sits with SCDES, so they're the ones who can confirm what's required before you get too far into planning.